Today our team visited the construction site in Wiener Neudorf. In perfect weather, we got a first-hand look at the progress: the precast structure is growing visibly, with columns, beams and wall elements being installed continuously. For us as structural engineers, visits like this are especially valuable – it is where our drawings and calculations become a real building.

Thurner Engineering team in helmets and high-visibility vests in front of the precast shell structure in Wiener Neudorf